Study planner

How many parts, operators and readings your study needs, what each requirement means in plain English, and where every number comes from.

  • Nothing to upload
  • Every number cited: AIAG, IATF, ISO/VDA, Bosch
  • No signup

1Which study are you planning?

2Your study

Variable Gage R&R (crossed): each operator measures each part several times, in random order, without seeing earlier readings.

What each requirement means

  • Every gage in the control plan gets a studyIATF

    If a measurement is in your control plan, your customer expects proof the gage can be trusted. The methods and acceptance criteria come from the AIAG MSA manual unless the customer agrees to others.

    IATF 16949:2016, clause 7.1.5.1.1
  • 10 parts × 3 operators × 3 trialsAIAG

    The MSA manual's worked example, and the design most customers expect. Repeat readings show how much one person disagrees with themselves (repeatability); several operators show how much people disagree with each other (reproducibility).

    AIAG MSA, 4th edition
  • %GRR under 10% passes, over 30% failsAIAG

    %GRR is the share of the variation you see that's really the gage. Under 10%, the gage is barely noticeable. 10% to 30% may be acceptable, depending on the application and cost. Over 30%, the gage is a big part of what you're measuring.

    AIAG MSA, 4th edition
  • ndc of 5 or moreAIAG

    The number of distinct categories: how many groups of parts the gage can reliably tell apart across your process. Below 5, it can't sort parts finely enough to control the process.

    AIAG MSA, 4th edition
  • Resolution of one-tenth or finerAIAG

    The gage's smallest step should be no more than a tenth of the process variation or tolerance. Coarser, and readings bunch into a few values that hide real differences.

    AIAG MSA, 4th edition
  • Pick parts across the whole rangePractice

    Measure a batch first and choose parts spread across it. Ten parts bunched in the middle make ndc and %study variation look worse than the gage really is.

    Common practice
  • German OEMs may ask for uncertainty insteadISO / VDA

    VDA Volume 5 and ISO 22514-7 judge measurement processes by measurement uncertainty (QMS, QMP) rather than %GRR. If your customer works to VDA 5, ask which studies they want.

    VDA Volume 5, 3rd edition (2021); ISO 22514-7:2021
Customer example: Ford Specifics for PPAP, Jan 2025

One OEM's published minimums, for comparison. Other customers set their own; check yours.

  • At a minimum 10 parts, 3 operators, 3 trials, using the ANOVA method. Parts must represent a production run with all known sources of variation and use the full range of part-to-part variation. §2.2.8
  • Report %GRR as both % of study variation and % of tolerance. Under 10% of tolerance acceptable; 10% to 30% needs the site STA engineer; over 30% unacceptable. Hold parts in production-intent fixtures. §2.2.8
Early access

The free tools give you the numbers. Mensuro gives you the study.

A screenshot shows a result. Your customer wants the whole study, traceable and signed off, and you want to know what to do about it.

  • Sigmi, your study assistant. Helps you pick the right study, explains every result in plain English and what to fix first, using the engine's numbers. It never makes one up.
  • Your brand on every report. Your logo, company and customer on a customer-ready PDF: verdict, charts, the method behind every number, and the raw data.
  • The studies behind the number. Gage R&R with a recheck when you reuse it on another part, Type 1 gage studies, and capability for each cavity of a multi-cavity tool.
  • Your spreadsheet as it is. Upload Excel or CSV. Mensuro finds the columns and you confirm before anything runs.
  • Validated, with a receipt. Every analysis reproduces published reference results, and every report shows its method, constants and sample size, so reviewers don't come back with questions.

Free to join. Founding members get the first year for $199. We only email you about Mensuro, and you can unsubscribe anytime. Nothing you entered in the planner is sent with this form.

Page one of a Mensuro capability report: verdict, key figures, chart and table
Page one of a Mensuro report. Your logo goes top left.
Sources

Where every number comes from.

Your customer's requirements win where they differ. The AIAG, ISO and VDA documents are sold by their publishers and are summarised here, not quoted.

The source tags

  • IATF IATF 16949, the automotive quality standard most OEMs require of suppliers
  • AIAG The AIAG reference manuals: MSA 4th ed. and PPAP 4th ed.
  • ISO / VDA ISO 22514 and VDA Volume 5, used by German OEMs
  • Bosch Bosch Booklet No. 10, capability of measurement and test processes
  • Practice Common practice that no manual makes a requirement
  • IATF, IATF 16949:2016, clause 7.1.5.1.1, Measurement systems analysis.
  • AIAG, Measurement Systems Analysis reference manual, 4th edition (2010): variable and attribute studies, kappa and effectiveness guidelines, analytic method.
  • AIAG, Production Part Approval Process manual, 4th edition (2006): initial process study acceptance criteria.
  • ISO 22514-7:2021, Capability of measurement processes; ISO 22514-2, process capability and performance of time-dependent process models.
  • VDA, Volume 5: Measurement and Inspection Processes, 3rd edition (July 2021).
  • Robert Bosch GmbH, Booklet No. 10: Capability of Measurement and Test Processes (Quality Management in the Bosch Group), Procedure 1.
  • D. C. Montgomery, Introduction to Statistical Quality Control, 6th edition (Wiley, 2009).
  • Minitab Support, Data requirements for the AIAG method for an attribute gage study.
  • Customer example: Ford Motor Company, Customer Specific Requirements for PPAP, 4th edition ("Ford Specifics for PPAP"), effective 6 February 2025, sections 2.2.8, 2.2.9 and 2.2.11.1. Published by the IATF; quoted from its PDF.